How Long Does a Renovation Take for a 3-Room, 4-Room, or 5-Room HDB Flat?

The renovation timeline varies depending on the scope of work, material selection, and the pace of decision-making by homeowners. Here’s what typically affects the duration:

1.⁠ ⁠Kitchen Renovation Timeline

The kitchen is usually the most time-sensitive area:
• Cabinets can only be measured after tiling is completed.
• Tabletops can only be measured after the cabinets are installed.
• Glass backing (if any) will only be measured after the tabletop is in.

Each of these steps requires lead time between trades and fabrication, which can extend the overall timeline.

2.⁠ ⁠Additional Works
• Works such as false ceilings, partition walls, and custom features (like niches or special finishes) may add more time.
• The more detailed the renovation, the longer it may take to coordinate and execute.

3.⁠ ⁠Material and Color Selection

We always guide and propose ideas to help with material and color selection, but the final choice is always up to the homeowner. Some owners make decisions quickly, while others may need more time to explore and consider different options.

General Timeline Estimate (For Reference):
• 3-Room Flat: ~7–9 weeks
• 4-Room Flat: ~9–11 weeks
• 5-Room Flat: ~11–13 weeks

Note: These are average estimates. The timeline may be shorter or longer based on the complexity of the project.

At Empire Works, we always aim to move efficiently while ensuring quality. We communicate closely with our clients at every step to keep things on track and transparent.

Need more tips?

Empire Works

Empire Works

Typically replies within an hour

I will be back soon

Empire Works
Hi, how can we assist you?
WhatsApp