HDB Kitchen Renovation Checklist: 10 Things to Do Before Work Begins

Why a Kitchen Renovation Checklist Matters

The kitchen is typically the most complex — and most expensive — room to renovate in any Singapore home. It involves hacking, waterproofing, tiling, plumbing, electrical works, and custom carpentry, all coordinated in a tight space. Skipping preparation almost always leads to delays, cost overruns, or rework. Use this checklist before your contractor breaks ground.

1. Confirm Your Layout First

Decide whether you’re keeping the existing kitchen layout or changing it before getting any quotations. Moving the sink or hob to a different wall means re-routing plumbing and gas lines — a significant cost. Confirm your layout in writing with your contractor so scope and price are locked in. For full kitchen renovation inspiration, read our HDB kitchen renovation guide.

2. Apply for the HDB Renovation Permit

Any works involving hacking, plumbing changes, gas works, or electrical modifications in an HDB kitchen require an HDB renovation permit. Your contractor must submit this application and receive approval before work begins. Jumping ahead risks fines and forced rectification. See our HDB renovation permit guide for full details.

3. Plan Your Wet and Dry Zones

Singapore kitchens are classified as wet areas. Define your wet zone (sink, dishwasher area) and dry zone (cooking area, countertop prep zone) clearly. This affects waterproofing requirements, tile slip ratings, and drainage positioning. A poorly defined wet zone leads to water seepage issues down the line.

4. Finalise Cabinet Dimensions Before Anything Else

Kitchen cabinets are measured and built to fit your specific space. Before confirming dimensions with your carpenter, verify that all appliances (fridge, oven, microwave, dishwasher) are measured and accounted for. Built-in appliance panels and housing must be part of the carpentry brief, not an afterthought. Empire Works’ carpentry contractors will guide you through this precisely.

5. Choose Your Countertop Material Early

Countertop lead times can be 3–6 weeks for materials like quartz, marble, or sintered stone. Do not leave this decision until after cabinets are installed — you’ll cause delays. Confirm the material, edge profile, and cutout positions (sink, hob) at the same time as your cabinet order.

6. Confirm Gas Point Location

If you’re installing a gas hob, verify the gas point location against your hob position. In Singapore, gas points are regulated — any change to gas piping must be done by a licensed gas contractor. Confirm this is included in your renovation scope or arrange it separately through SP Group.

7. Plan Your Electrical Points

Modern kitchens demand more power points than most homeowners expect: refrigerator, microwave, oven, rice cooker, kettle, coffee machine, dishwasher, exhaust fan, and dedicated circuits for heavy appliances. Map every appliance to an electrical point before your electrician runs the conduits. Adding points after tiling is expensive and disruptive.

8. Sort Out Exhaust and Ventilation

Singapore HDB kitchens must have adequate ventilation. If you’re upgrading your hood or adding a new exhaust fan, confirm the ducting route and whether you need to create a new opening in the external wall — this requires an HDB permit and structural consideration.

9. Protect the Rest of Your Home During Renovation

Kitchen hacking generates enormous dust and debris. Before work begins, seal off adjoining rooms with plastic sheeting, tape ventilation grilles in other rooms, and remove furniture from adjacent areas. This dramatically reduces post-renovation cleaning effort.

10. Set a Clear Payment and Milestone Schedule

Kitchen renovations should be paid in stages tied to milestones — not upfront in full. A typical schedule: 20% deposit, 30% after hacking and wet works, 30% after carpentry installation, 20% on completion and handover. Never pay more than 20% before work begins. Review our guide on choosing the right renovation contractor for more on this.

Start Your Kitchen Renovation Right

A well-prepared kitchen renovation is a stress-free kitchen renovation. Empire Works handles every element of your kitchen — from initial planning and permits to final handover — with full transparency. Check out our HDB Resale Full Kitchen Package or contact us for a free consultation.