Skip to content

HDB Resale Full Reno With Vinyl

3 Room — $37000
4 Room — $39000
5 Room — $41000

Comes with the following free gifts:

– EF Hood and Hob
– Rubine Stainless Steel Sink and Faucet
– Rubine Instant Heater

YOU GET WHAT YOU SEE!

Consultation Service

Renovation consultation and space planning

Consultation of design, layout, material, colours scheme

To provide project management, schedule, and constant update of site

Demolition

Hack existing floor and wall finish of kitchen area and 2 bathrooms

Hack existing skirting of at living/dining, bedrooms for the purpose of installing PVC skirtings

Dismantle existing kitchen cabinet, sink support, mortar base, if any

Masonry

To apply HDB approved waterproofing membrane on flooring at kitchen and 2 bathrooms

To screed and lay homogeneous floor tiles for kitchen floor

To screed and lay anti slip homogeneous floor tiles for both bathrooms

To screed and lay homogeneous/Ceramic wall tiles tiles at both bathrooms

To screed and lay homogeneous/Ceramic wall tiles (exposed area) at kitchen area (not exceeding 400 sq ft)

All tiling works come with:

  • Skirting  
  • Tile size up to 600mm x 600mm
  • Tile price up to $4 psf from Lian Seng Hin
  • Odd shaped or oversized tiles will incur more charges

To screed and plaster non exposed area walls at kitchen area

To construct cement mortar base for kitchen cabinet with outlet

To construct cement mortar washing machine base with outlet

Carpentry

To construct and install 10 feet top & 10 feet bottom kitchen cabinet with the following

  • Soft closing and anti slam hinges
  • 3 sets of soft closing and anti slam drawers
  • Blum Aventos HK for top hung dish rack door, if any
  • Stainless steel dish rack and cutlery tray

Table Top

To construct 10 feet quartz table top, inclusive opening for sink and hob, with skirting. 8 selections

Vinyl Flooring

To supply and install 5mm click system vinyl for living room and bedrooms

To supply and install PVC skirting for living rooms and bedrooms

Electrical

To remove whole unit existing wiring and electrical related

To replace Main Distribution Box with 16-way DB

To install whole unit ceiling light

To run 1 lighting point, 1 heater point for each toilets

To install 2 lighting points for living room, 1 lighting point for each bedroom

To run 2 lighting point, 1 hood point, 2 single point (fridge and washing machine), 3 double points for kitchen

To run 4 double point for living room, 3 double points for MBR and 2 double points for each CBR

Plumbing

To run exposed stainless steel water pipe for kitchen and both bathrooms

To install kitchen sink, in/outlet and washing machine in/outlet for kitchen

To install both bathrooms toilet bowl, wash basin with tap, instant heater, bidet spray, accessories

Painting

To paint whole unit wall with Nippon Vinilex 5000 (up to 4 colors) and ceiling with Matex

To paint whole unit door frame, big pipes with Nippon Bodelac

Door

Supply and Install 2 sets of slide and fold toilet doors

General

To provide haulage of building materials

Clearing of debris off renovation site.

Corrugated paper to protect existing flooring

To provide Chemical Wash after wet works

To provide General cleaning upon completion of works.

Our Projects

In our fully equipped showrooms our experienced advisors are happy to help you transform your ideas into clear designs

We love to transform your ideas to life.

Empire Works

Empire Works

Typically replies within an hour

I will be back soon

Empire Works
Hi, how can we assist you?
Start Chat with:
chat